Herunterladen Diese Seite drucken

Zehnder Pumpen CPS 20-5M SM GG 230V Einbau- Und Bedienungsanleitung Seite 21

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Read before using!
Observe all safety instructions!
Keep at the place of operation!
These operating instructions contain important notes and warnings. By all
means, read the operating instructions before installing, electric connection and
commissioning.
Other operating and installation instructions dealing with components / acces-
sories of the CPS have to be take into consideration in addition.
We cannot assume liability or guarantee for damage and consequential dam-
age, which are caused by the non-observation of these instructions or technical
rules and recommendations.
Status: V 1.9 January 2023
Subject to technical modifications and error.
No liability is accepted for printing errors.
Zehnder Pumpen GmbH • Zwönitzer Strasse 19 • D-08344 Grünhain-Beierfeld • Telephone: +49 (3774) 52 - 100 • Facsimile: +49 (3774) 52 - 150 • e-mail: info@zehnder-pumpen.de
Installation and operating instructions
CPS15/20/25/35
© zehnder 01/23
21

Werbung

loading