Herunterladen Diese Seite drucken

Diamond E7/F13A4-N Installations- Und Bedienungsanleitung Seite 38

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 96
Proceed with the operations described
in "Starting production".
In order to free air in the pipes,
open the network lock, turn the
knob of the appliance while pressing it
in the piezoelectric position, place a
flame (match or the likes) on the pilot
light and wait for it to ignite.
DAILY DECOMMISSIONG / Upon
completion of the operations descri-
bed above:
1. Close the network locks upstream the
appliance (e.g. Water - Gas - Electric).
2. Make sure that the drain cocks (if
present) are "Closed".
3. Check the cleanliness and hygiene
of the appliance.
PROLONGED DECOMMISSIONING
/ In case of prolonged inactivity, per-
form all the procedures described for
daily putting out of service and protect
the parts most exposed to oxidation
CONTACT AUTHORIZED TECHNICAL ASSISTANCE AND CON-
SULT THE TECHNICAL MANUAL.
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
OPERATIONS FOR COMMISSIONING
as indicated below:
1. Use lukewarm water with a bit of
soap to clean the parts;
2. Rinse the parts thoroughly, wi-
thout using pressurised and/or direct
water jets;
3. Dry the surfaces carefully using
non-abrasive material;
4. Wipe a non-abrasive cloth lightly so-
aked with food-safe Vaseline oil over all
of the stainless steel surfaces in order
to create a protective film.
For appliances with doors and rubber
gaskets, leave the door slightly ajar to
let it air out and spread protective talcum
powder on the rubber gasket surfaces.
Periodically air the appliances and
rooms.
a year by an authorised technician of
the assistance service.
REPLACING COMPONENTS
- 13 -
To make sure that the appliance
is in perfect technical conditions,
arrange for service at least once
5.
EN
6.

Werbung

loading

Diese Anleitung auch für:

Difrbe74a