Wiring Guide
/ Leitfaden für die Verkabelung
• Please make sure that the wires, circuit breakers and other accessories used
for wiring are undamaged, fit the product parameters and specifications, and
comply with the relevant standards and regulations of your country or region.
• Before installing this product, it is important to measure the present load of
your home electrical circuit and ensure that it can carry the operating current
of this product, otherwise the circuit will be tripped.
• After powering on the product, it will initiate device wiring testing. To confirm
that the self-check process has been successful, verify that there are no
abnormal indicator light effects (refer to the section on Indicator Light for
more information).
• Vergewissern Sie sich, dass die für die Verdrahtung verwendeten Kabel,
Schutzschalter und sonstigen Zubehörteile unbeschädigt sind, den
Produktparametern und -spezifikationen entsprechen und den einschlägigen
Normen und Vorschriften Ihres Landes oder Ihrer Region genügen.
• Vor der Installation dieses Produkts ist es wichtig, die aktuelle Belastung
des Stromkreises zu messen und sicherzustellen, dass der Stromkreis den
Betriebsstrom dieses Produkts tragen kann.
• Nach dem Einschalten des Geräts wird ein Verdrahtungstest durchgeführt.
Stellen Sie sicher, dass der Selbsttest erfolgreich durchgeführt wurde, indem
Sie überprüfen, dass keine abnormen Effekte der Kontrollleuchten auftreten
(weitere Informationen finden Sie im Abschnitt über die Kontrollleuchten).
I.Power Input Port
/ Anschluss für die Stromzufuhr
Three-phase: L1
L2
L3
N
PE
10 |
Single-phase: L1
N
PE
5×
L 1
L 2
5×
G
❶
❷