Herunterladen Diese Seite drucken

Wolf CHA-07 Betriebsanleitung Seite 26

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3 | Installation
3.4
Installing a base bracket on the prefab foundation
NOTE
Stability of the heat pump
► The prefabricated foundation must be installed on the floor or base bracket.
1.
3.
2
1 Open-ended spanner
1. Place the base bracket on the prefabricated foundation.
2. Level the base bracket in the longitudinal and transverse axes using a spirit level by adjusting the
feet.
3. Anchor the 4 feet of the base bracket to the prefab foundation using the 4 mounting plates.
26 | WOLF GmbH
2.
1
4.
2 Mounting plate
CHA / FHA
9149242 | 202311

Werbung

loading