Herunterladen Diese Seite drucken

GFL 3005 Aufbau- Und Bedienungs-Anleitung Seite 10

Schüttelapparate
Vorschau ausblenden Andere Handbücher für 3005:

Werbung

Schüttelapparate
3005
/ 3006
/ 3011
5. Operation
A mechanical clockwork serves to run the Shaker in continuous or timed operation.
All models are equipped with ac motors, protected against overload. The electronic frequency
control ensures a gentfe start-up, irrespective of load.
A stable and durable mechanical construction serves to impart the torque of the motor with the
specific shaking motion to the shaking platform.
6. Servicing,
maintenance
Exchanging
the fuses
The two fuses of the shaker are situated in a drawer below the unit plug. In order to check or to
exchange these fuses, press the fixing clips on both sides of the drawer and pull.
The fuses may only be exchanged against fuses of the same type. Information on the
fuse type can be found on the nameplate next to the unit plug and in the spare parts list
of these operating
instructions.
Breakdown
in case
of overload
Ovemeating of the shaker due to overload will cause the shaker to be switched off.
Caution, the unit will restart automatically
If the unit is switched off due to any kind of breakdown, it must by all means be switched off,
before
the shaker
is touched.
GFL Shakers are produced with first class materials and are made to withstand even rough
service conditions. Nevertheless, the units should only be subjected to rough conditions within
sensible
limits.
The off-white pulver-coated surfaces of the housing and the shaking platfom may be cleaned
with mild detergents, if necessary.
Please do not hesitate to contact your local dealer or us for technical support.
fn case of complaints please contact your local dealer or us:
Schulze.DeIluschStrasse
Servicings, repairs or modifications must be carried out according to the
commonly
recognised
only.
Only original spare parts must be used. Always demand a detailed confirmation of the carried
out tasks by the person in charge (company, date, signature).
- Shakers
/ 3013
/ 3015 / 3016
and clearing possible defects
Please
make
sure
that
connections
or the electrical
Before cleaning and/or opening the unit (only by an electrician!)
always pull the plug from the mains socket.
Danger of electrical
and
mains
failure
aner cooling down or after mains failures.
GFL
Gesellschaf
für
4
Technical Rules and Regulations
Seite
/ 3019 / 3023
no fluids
come
into
parts of the inside unit!
shock !
Labortechnik
mbH
D-30938 Burgwedel
Germany
by competent electricians
24 Rev.l
contact
with
cable

Werbung

loading

Diese Anleitung auch für:

300630113013301530163019 ... Alle anzeigen