Installation- and operating instructions:
To avoid contamination of the stainless steel threads and the floor drain pot, you have to
cover them with the enclosed, self-adhesive building protection.
The drain pot can then be concreted in the for this purpose provided base plate. (flush pool
surface)
Pay attention to a possible floor insulation. (for example Neptun ISO-Massiv Hackenfalz-
platten)
If there are, despite these measures, contaminations of the threads, they have to be cleaned
with the thread cutter M6/III.
The film or fleece respectively must be removed for the screw passage with the help of a
hole punch, so that surplus film cannot be grinded down in the thread.
Installation- and operating instructions:
When installing the floor drain, pay attention that there is an all-round gradient provided
for it in the base plate. Furthermore make sure that regarding the mounting depth you con-
sider a possible later attachment of a floor insulation.
When laying a film later, pay attention that there is no overlap in the area of the floor
drain.
6