Herunterladen Diese Seite drucken

Kress KG470 Übersetzung Der Originalanleitung Seite 11

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
Using the clip (See Fig. A5)
A
A5
Adjust adjustable skid shoes to control
working height according to different
working conditions.(See Fig. A6)
A
A6
1
1
2
NOTE: Adjust upward for hard-packed snow.
Adjust downward when operating on gravel or
crushed rock surfaces.
Checking the battery charge condition (See
Fig. B1)
A
B1
NOTE: Fig. B1 only applies for the battery pack with
battery indicator light.
The battery level can be known from the battery
indicator light by pressing the button beside
the lights. Before starting or after use, press the
A2
button beside the power indicator light on the
battery pack to check the battery capacity
Remarks
Five green
lights are
illuminated.
Four green
lights are
illuminated.
Three green
lights are
illuminated.
A2
Two green
lights are
illuminated.
One green
light are
illuminated.
No light is
illuminated.
Charging the battery pack (See Fig. B2)
A
B2
A2
100%
0%
- Your battery pack is partly charged and needs to
be fully charged before first use.
- More details can be found in charger's manual.
LED-
Battery condition
light
70% ≤ Power level ≤
100%
50% ≤ Power level <
70%
35% ≤ Power level <
50%
20% ≤ Power level <
35%
10% ≤ Power level <
20%
Power level < 10%
A2
EN
11

Werbung

loading

Diese Anleitung auch für:

Kg470.x