Herunterladen Diese Seite drucken

Eaton NRX Serie Installationsanleitung Seite 3

Vorschau ausblenden Andere Handbücher für NRX Serie:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Removal Instructions
for Series NRX Spring Release, Latch
Check Switch and Motor Operator
Section 2: Installation of spring release
Proceed with the following eight steps:
Step 1: Remove the four screws holding the front cover in place (two
on each side of the cover).
Figure 3. Step 1
Step 2: Remove the front cover. Pull down on the charging handle to
simplify removal.
Figure 4. Step 2
Step 3: To gain access to the mounting location, pull the charging
handle down as shown in Figure 5.
Instruction Leaflet IL01301010E
SR Mounting Location
Figure 5.
Step 3
Step 4: Position the spring release as shown to begin the installation
process (Figure 6).
Note: The spring release is secured in its mounted position with one captive
retaining screw.
Captive Mounting Screw
Figure 6.
Step 4
EATON CORPORATION www.eaton.com
effective January 2013
3

Werbung

loading