Figure 37. Step 2
TO REMOVE RIGHT AND LEFT ACCESSORY TRAYS OR ANY OTHER
ELECTRICAL ACCESSORY, THE APPROPRIATE ACCESSORY CONNECTOR PLUG
MUST FIRST BE DISCONNECTED.
Step 3: To remove an accessory connector plug on a drawout circuit
breaker, unplug it from its secondary plug housing. Refer to Item 2 and
Figure 31 under the heading "General information" in this section for
detailed assistance with the removal.
Section 10: Spring release/latch check/
motor operator testing
• IMPORTANT
BEFORE PERFORMING ANY TEST ACTIVITIES, LEVER A DRAWOUT CIRCUIT
BREAKER TO THE TEST POSITION. FOR FIXED TYPE CIRCUIT BREAKERS,
MAKE SURE PRIMARY CIRCUITS ARE DE-ENERGIZED.
Spring release testing
1. Verify that the circuit breaker is in the Open position. Charge the
breaker's closing spring using the manual charging handle.
2. Apply rated voltage to the spring release and verify that the breaker
toggles to the Closed position.
Spring release with internal latch check switch testing
Place the circuit breaker in the different positions shown in Table 5 and
apply rated voltage to the spring release.
N
ote:
The voltage needs to be removed from the spring release before it can be
applied each time.
12
EATON CORPORATION www.eaton.com
IMPORTANT
Installation and Removal Instructions
for Series NRX Spring Release, Latch
Check Switch and Motor Operator
Table 5. Testing Sequence with Internal Latch Check Switch
Initial Breaker
Position
Spring Release Result
OPEN,
Does not
discharged
actuate
OPEN, charged
Actuates
CLOSED,
Does not
discharged
actuate
CLOSED, charged
Actuates
Hold OPEN button,
Does not
discharged
actuate
Hold OPEN button,
Does not
charged
actuate
Spring release with external latch check switch testing
Place the circuit breaker in the different positions shown in Table 6 and
check the continuity between the leads shown in the table.
Table 6. Testing Sequence with External Latch Check Switch
NF
Continuity Between Red (42)
and Black (41) Leads
RF
Initial Breaker
Continuity Between Red (56)
Position
and Black (55) Leads
OPEN,
Yes
discharged
OPEN, charged
No
CLOSED,
Yes
discharged
CLOSED, charged
No
Hold OPEN button,
Yes
discharged
Hold OPEN button,
Yes
charged
Motor operator testing
1. Verify that the circuit breaker is in the open and discharged
condition. Apply voltage to the motor operator. Breaker charging
should initiate. Verify that the breaker flag changes state to indicate
the fully "Charged" condition, and that the motor operator has
stopped running.
2. Close the breaker and verify that the motor operator automatically
charges the breaker again.
3. Drawout breaker only: Remove voltage from the motor operator
and return breaker to the open and discharged condition. Hold the
levering access door open and apply voltage to the motor operator.
The operator should NOT charge the breaker. Release the levering
access door and verify that the operator charges the breaker.
Final Breaker Position
No change
Closed
No change
Attempts to close again
No change
No change
NF
Continuity Between Blue
(40) and Black (41) Leads
RF
Continuity Between Blue
(54) and Black (55) Leads
No
Yes
No
Yes
No
No