Herunterladen Inhalt Inhalt Diese Seite drucken

BDS Maschinen MAB 525 Originalbetriebsanleitung Seite 54

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
Operation
Drilling with core drills
54
Proceed as follows when drilling with core drills:
Install the quick-change drill chuck system (A) and connect
up the cooling lubricant system.
Install the appropriate ejector pin in the core drill and insert
the core drill into the quick-change drill chuck system (A).
Position the machine at the working location, align it and
switch on the magnetic clamps.
Select the appropriate speed and switch on the machine.
NOTE
Observe the following instructions when drilling with core drills:
Drilling with core drills requires no great effort. The drill-
ing process is not accelerated by higher pressure. The drill
wears faster and the machine can be overloaded.
Use the cooling lubricant system installed on the machine
with high-performance cutting oil BDS 5000.
The cooling lubricant system cannot be used when working
overhead. In this case use the high-performance grease
spray ZHS 400. Spray the drill on the inside and outside
before drilling. Repeat this procedure when drilling deeper
holes.
Pay attention to a regular chip discharge. With larger drilling
depths, break the chip.
MAB 525

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis