Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Appliance - STAMOS S-LS-2 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

INSTALLING THE APPLIANCE

Appliance location
The work surface where the device will be located must be suitable for the size of the appliance, please refer to the mea-
surements. The work surface must be levelled, dry, heat-resistant and at a fitting height from the ground to enable a proper
use of the device.
The power cord connected to the appliance must be properly grounded and correspond to the technical details.
SMD REWORK STATION 6101 | S-LS-2 OPERATION:
1.
Device must be placed on stable work table, SMD rework gun must be placed into the holder.
2.
Fix the appropriate nozzle and connect the device to the power source.
3.
Turn on the device with the main switch placed at the back of the device, turn on the SMD rework gun with switch
(1), gun will start to heat.
4.
Press ENTER button, first digit on the SMD rework station temperature display will start blinking. Using buttons
(6) set the desired value, then press ENTER button again, second digit on the display will start blinking. Again, using
buttons (6) set the desired value and press again ENTER button – third digit on the display will start blinking – using
buttons (6) set the desired value. If the soldering iron is turned on, press the ENTER button again and first digit on
the soldering iron temperature display will start blinking. Further temperature setting procedure is the same as for
the SMD rework gun:
5.
Setting the desired airflow volume: set the desired airflow volume using airflow volume adjustment knob.
6.
After work, the SMD rework gun should be placed into the holder. Turn off the SMD rework by switch (1).
7.
If the device is not used for a long time, it should be completely disconnected from the power source.
SOLDERING STATION 6101 | S-LS-2 OPERATION:
1.
Device must be placed on stable work table, soldering iron must be placed into the holder.
2.
Fix the appropriate soldering tip and connect the device to the power source.
3.
Turn on the device with the main switch placed at the back of the device, turn on the soldering iron with switch (4),
it will start to heat.
4.
Temperature setting procedure is the same as for the SMD rework temperature setting described above.
5.
After work, the soldering iron should be placed into the holder. Turn off the soldering station by switch (4).
6.
If the device is not used for a long time, it should be completely disconnected from the power source.
12
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

S-ls-461016103

Inhaltsverzeichnis