Herunterladen Inhalt Inhalt Diese Seite drucken

Heiko JZ025-Q2 Montageanleitung Seite 54

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1
JZ025-C2
JZ025-Q2
JZ035-C2
JZ025-A1
1
JZ035-Q2
JZ035-A2
M2T050-D2
1
JZ050-Q2
JZ050-A2
JZ068-C2
JZ050-C2
The explosion-proof breaker of the air conditioner should be all-pole switch. The distance between its two contacts should not be no
A explosion-proof breaker must be installed.
 
FOR
JZ025-C2
JZ035-C2
JZ050-C2
JZ068-C2
JZ025-Q2
JZ035-Q2
JZ050-Q2
JZ050-A2
JZ035-A2
JZ025-A1
20
20
25
Outdoor unit
Connecting wiring
Power cable
POWER
To Indoor unit
15
1.0
15
1.5
2.5
20
.
ceramic type of T 25A/250V.
JZ035-C2
Model
JZ025-C2
 
JZ025-Q2
JZ035-Q2
2
4G 1.0 mm
4G 1.0 mm
2
3G1.0mm
3G1.5mm
20
20
30
25
JZ025-A1 JZ050-C2
JZ050-A2
JZ035-A2
JZ068-C2 JZ050-Q2
2
2
4G 1.0 mm
2
3G2.5mm
2
30
30
24

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis