Herunterladen Inhalt Inhalt Diese Seite drucken

Before Using The Equipment - EINHELL AQUINNA 18/28 Originalbetriebsanleitung

Akku-gartenpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Guaranteed sound power level ............. 70 dB (A)
Protection .....................................................IPX4
Important!
The equipment is supplied without batteries and
without a charger and is allowed to be used only
with the lithium-ion batteries of the Power X-
Change series!
The lithium-ion batteries of the Power X-Change
series are allowed to be charged only with the
Power-X charger.

5. Before using the equipment

The equipment is supplied without batteries
and without a charger.
As a basic principle, we recommend the use of
a preliminary fi lter and a suction set with suction
hose, intake cage and non-return valve, in order
to prevent long priming periods and unnecessary
damage to the pump as a result of stones and
solid foreign bodies.
5.1 Connecting the intake line
Fasten the suction hose (at least approx. 19
mm (¾") plastic hose with spiral reinforce-
ment) to the suction connection approx.
33.3 mm (R1 male thread) of the equipment
either directly or via a threaded nipple.
The suction hose used should be equipped
with an intake valve. If the intake valve cannot
be used, a non-return valve should be ins-
talled in the intake line.
Position the intake line so that it rises from
the water withdrawal point to the equipment.
Avoid positioning the intake line higher than
the pump, as this would delay the escape of
air bubbles from the intake line and impede
the priming process.
Install the intake and discharge lines in such
a way that they do not exert any mechanical
pressure on the equipment.
The intake valve should be low enough in the
water to ensure that if the water level falls, the
unit will not run dry.
A leaking intake line will draw in air and there-
fore not draw in any water.
Prevent the intake of foreign bodies (sand,
etc.). If necessary, install a coarse filter for
this purpose.
Anl_Aquinna_18-28_SPK13.indb 19
Anl_Aquinna_18-28_SPK13.indb 19
GB
5.2 Connecting the discharge line
The discharge line (min. approx. 19 mm
(3/4")) must be connected to the female
thread discharge line (approx. 33.3 mm (G1
female thread)) connector of the equipment
either directly or with the aid of a threaded
nipple.
You can also use a pressure hose of approx.
13 mm (1/2") with the relevant couplings. The
pump rate is reduced when using the smaller
discharge line.
During the priming process, the shut-off
devices present in the discharge line (spray
nozzles, valves, etc.) must be completely
open so that the air in the intake line can es-
cape freely.
5.3 Preparing the pump (Fig. 1)
Use the supplied wrench (9) to undo the wa-
ter filler screw (3). Now you can fill the pump
housing with water via the water filler screw.
Filling the intake line will accelerate the pri-
ming process.
Assemble in reverse order.
5.4 Fitting the battery (Fig. 2)
Open the battery cover.
Press the side pushlock button of the battery
pack as shown in Fig. 2 and push the battery
pack into the mount provided. When the battery
is positioned as in Fig. 2, make sure that the
pushlock button latches in place! To remove the
battery pack, proceed in reverse order.
Important!
Use only batteries which are charged to the same
level. Never combine full and half-full batteries.
Always charge the two batteries simultaneously.
The equipment's operating time depends on the
battery with the lower charge level. The two batte-
ries must always be fully charged before use.
5.5 Charging the battery (Figure 3)
1. Take the battery pack out of the equipment.
Do this by pressing the pushlock button.
2. Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Insert the power plug of the charger
(F) into the socket outlet. The green LED will
then begin to fl ash.
- 19 -
14.12.2022 08:15:26
14.12.2022 08:15:26

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

41.804.40

Inhaltsverzeichnis