Assembly instructions
4.3
Installation
2 people are needed to install the unit.
CAUTION!
Risk of injury from sharp metal housing!
The inner metal of the casing can have sharp edges.
Wear suitable protective gloves.
IMPORTANT NOTE!
Horizontal installation of units!
When installing the units, ensure that they are completely horizontal to ensure
proper operation.
IMPORTANT NOTE!
Install connections in the de-energised state!
Connections must be installed without tension!
Use a suitable tool to protect terminal nuts from being sheared off and
twisted.
IMPORTANT NOTE!
Avoid draughts!
Consider the occupied zone when installing/suspending the units. Do not expose
people to the direct air flow. Position the unit accordingly.
7
6
5
Before initial commissioning, check whether all the necessary conditions have been met so that
the unit can operate safely and properly.
Electrical tests
Water-side checks
If Ultra Allround is carried/
mounted without outer
packaging, lift the unit only by
the underside!
Condensation water connection
Pre-commissioning checks
Check whether all lines have been properly laid.
Check whether all lines have the necessary cross-section.
Are all wires connected in accordance with the electric wiring diagrams?
Is the earth wire connected and wired throughout?
Check all external electrical connections and terminal connections are fixed in place and
tighten if necessary.
Check whether all supply and drainage lines have been properly connected.
Fill pipes and unit with water and bleed.
Check whether all bleed screws are closed.
Check leak tightness (pressure test and visual inspection).
Check whether the parts carrying water have been flushed through.
Check whether any shut-off valves fitted on site are open.
Check whether any electrically actuated shut-off valves have been properly connected.
Check whether all valves and actuators are working properly (note permitted mounting pos-
ition).
Check whether the condensation tray is free of building rubble.
Check the condensation drain and operation of the alarm signal on the condensation pump.
Check whether the cooling valve switches off in the event of an alarm signal.
Check whether the unit is connected leak-free to the on-site condensation connection.
Check whether the waste water lines are clean and have a sufficient gradient.
Check whether the condensation pump has a working power supply.