Herunterladen Inhalt Inhalt Diese Seite drucken

Daikin Altherma EHYKOMB33AA Installations- Und Bedienungsanleitung Seite 44

Hybrid-wärmepumpe – gasboilermodul
Vorschau ausblenden Andere Handbücher für Altherma EHYKOMB33AA:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 46
17 Technical data
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
CONTROLS
Automatic bypass to system
Boiler interlock
ALL SYSTEMS
CENTRAL HEATING MODE
Central heating return temperature
COMBINATION BOILERS ONLY
DOMESTIC HOT WATER MODE
Cold water inlet temperature
CONDENSING BOILERS ONLY
ALL INSTALLATIONS
* All installations in England and Wales must be
Competent Persons Scheme. A Building Regulations Compliance
Installation and operation manual
44
Fitted
Fitted
Fitted
Fitted
mbar
mbar OR
to Local Authority Building Control (LABC) either directly or through a
will then be issued to the customer.
Programmable room thermostat
Optimum start control
Combination Boiler
Yes
OR
OR
Yes
Yes
OR
Yes
Temperature
AND
Ratio
²
AND
Ratio
²
www.centralheating.co.uk
www.centralheating.co.uk
Daikin Altherma hybrid heat pump – gas boiler module
Yes
mbar
mbar
Yes
Yes
Yes
Yes
Yes
EHYKOMB33AA
4P353067-1L – 2022.09

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis