Herunterladen Inhalt Inhalt Diese Seite drucken

Haier HAH64EXCP Bedienungsanleitung Seite 60

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 117
Operations to be carried out to make a new
connection:
- Choose the power supply cable in accordance
with the recommendations in the table;
- Pass the power supply cable into the clamp;
- Strip the end of each conductor of the supply
cord on a 10mmlength, by taking in account the
requested length of the cord for theconnection
t o the terminal block;
-According to the installation and with the help
of shunt bars which you should have recovered
in the first operation, fix the conductor asshown
on the chart;
- Fix the cover;
- Screw the cable clamp.
Note: make sure the terminal board screws
are tight.
Operations to be carried out to make a new
connection:
- Choose the power supply
cable in accordance with
the recommendations in
the table;
- Pass the power supply
cable into the clamp;
- Strip the end of each
conductor of the supply
cord on a 10 mm length, by
taking in account the
requested length of the cord for the connection
to the terminal block;
- According to the installation and with the help
of shunt bars which you should have recovered
in the first operation, fix the conductor as shown
on the chart;
- Fix the cover;
- Screw the cable clamp.
ATTENTION:
If it should be necessary to replace the power
supply cord, connect the wire in accordance
with following colors/codes:
BLUE
BROWN
YELLOW-GREEN
SHUNT
Neutral
Live
( )
Earth
Connection to the terminals on the terminal
block
LAY OUT "1-3-5" LAY OUT "2-4"
MONOPHASE or TWO PHASES 220-240 V~
Cable
HO5V2V2F
THREE PHASES 220-240 V3~
Cable
HO5V2V2F
THREE PHASES 380-415 V2N~
Cable
HO5V2V2F
380-415V 2N ~
PE
L1
L2
220-240V ~
PE
L
L1 / L2 / L3 = Phase
GB 60
3x2,5 mm2
3x4 mm2
4x1,5 mm2
4x1,5 mm2
4x1,5 mm2
4x1,5 mm2
220-240V 3 ~
L3
PE
220-240V 2 ~
PE
N
Neutral
=
L2
L1
L2
L1
PE= Earth

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis