Herunterladen Inhalt Inhalt Diese Seite drucken

Recommended Uv-B + Uv-A Radiation Application; Connecting The Uv Bar To The Mains Power; Connecting Uv Bars Together In Series With Daisy Chain Cables - Lumatek LUMLED013 Bedienungsanleitung

30w uv ergänzende led-lichtleiste
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18

6.3 Recommended UV-B + UV-A Radiation Application

Always mix the supplemental UVB + UVA radiation with the Lumatek Zeus Full Spectrum LED Range.
The UV bars have been designed for 12 hours operation to match the flowering photoperiod and can be
switched ON/OFF at the same time as the Zeus full-spectrum fixture.
UV strategic exposure to flowering plants can begin from 4 weeks before harvest and particularly the last 2-3
weeks of bloom when flower and resin development is most present.
For a good UV radiation spread, ensure to install the recommended minimum units and follow the distance to
canopy referred on the Grow Light Strategies table, download from: https://lumatek-lighting.com/education/
If you notice plant damage, we recommend to increase the distance between fixture and canopy or
decrease the UV light output delivered to your plants by reducing the UV photoperiodic time.

6.4 Connecting the UV bar to the mains power

Warning! Make sure mains power is switched off.
Warning! Ensure the power supply cable is not coiled and does not touch any hot surfaces.
Warning! Connect the cables according to local rules, safety regulations and electrical code.
Warning! Do not connect or disconnect the LED fixture under load.
The Lumatek UV LED bar power cable (4m) and the UV LED bar daisy chain cable (1.5m) are both sold sepa-
rately.
The power cable should be connected to the UV bar power input port;
Remove dust cap from UV bar Input connector.
Correctly align connectors and push together until 'click-locked'.
Connect mains power plug to switching gear/power supply.
Switch on mains power.
To disconnect;
Switch OFF mains power
turn power cable connector twist-lock anti-clockwise and pull apart from bar connector port.

6.5 Connecting UV bars together in series with daisy chain cables

A UV bar power cable is required to power the first UV bar and then further UV bars can be connected in series
from the first bar and powered with the UV daisy chain cables.
Maximum 30pcs UV bar can be daisy-chained from one power source.
Ensure mains power is OFF
Using the Lumatek UV daisy chain cable; connect UV bar [1] power output port to UV bar [2] power input port
by correctly aligning connectors and push together until 'click-locked'.
Continue until all UV bars are connected.
Switch on mains power.
To disconnect;
Switch OFF mains power
Turn daisy chain cable connector twist-lock anti-clockwise and pull apart from bar connector port.
Warning! Do not connect or disconnect the UV bars under load.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis