Herunterladen Inhalt Inhalt Diese Seite drucken

Sealing Inspection; Final Inspection - Kuppersberg FS 32 Technischer Pass

Tischkochplatte
Vorschau ausblenden Andere Handbücher für FS 32:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ENGLISH
Figure 10
2.4.2 NG (natural gas)
connection
1- G1/2 Nipple)
2- Silicon seal
3- G1/2 NG hose (EN 14800 compliant
natural gas hose)
Figure 11
 If your equipment is set for natural
gas, get the equipment connected by the
installation firm of the concerned natural
gas distribution
company. Natural gas
connection of your equipment is ½".
 If you desire to convert your
equipment from LPG to natural gas or from
natural gas to LPG, contact with the nearest
TECHNICAL PASSPORT
service centre and make them do the
required gas conversion settings.

2.5 Sealing inspection

 Open the pressure-reducing valve or
natural gas valve and control by application
of much foamy water on the connection to
find out any gas leakage.
Never control by flame.

2.6. Final inspection

1.
Plug the power cable into the
socket and activate the fuse of the
equipment.
2.
Control the functions.
2.6.1
LPG-NG / NG-LPG conversion
Figure 12
Remove the burner cover and burner as
shown in in the Figure 12.
Figure 12.1
ОRemove the injector by help of 7's sock-
et screwdriver as shown in the Figure 12.1
Built - in cooker
31

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis