Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation Before Hood Installation - GLOBALO Silentio 60 Gebrauchs- Und Montageanleitung

Einbau-dunstabzugshaube
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN

PREPARATION BEFORE HOOD INSTALLATION

• Check whether the dimensions of the purchased product are suitable for the selected place of
installation.
• Disconnect and remove (if possible) any appliances in the installation space to facilitate access
to the ceiling or wall where the hood will be installed. If this is not possible, secure these ele-
ments.
• Check whether there is a socket near the hood installation space and whether it is possible to
connect the hood to a ventilation duct for fume extraction.
• Make sure there are no lines of electric and plumbing installations in places where holes will
be drilled.
• Prepare the following tools: tape measure, pencil, drill/driver, Ø3 mm drill bit, screwdriver,
level.
CAUTION!
TAKE CARE NOT TO SCRATCH THE HOOD.
SILENTIO 60
275
275
SILENTIO 80
275
275
Fig. 4
26
150
150
150
150
100
8
100
7
290
8
7
290
100
8
100
7
290
8
7
290

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Silentio 80

Inhaltsverzeichnis