6. Assembly
One or two earthing terminals must be placed on the right
next to the module.
The two equipotential bonding terminals on the module must
each be connected to the earthing terminal using a
2.5 mm
cable.
2
Wiring Diagram/Terminal Assignment
See page 8
WARNING
Damage caused by incorrect use!
Installation outside of the hazardous area in the enclosure, at
least IP20 or closed switchgear.
The assembly, dismantling, installation and commissioning
may only be executed by a skilled electrician who has been
authorised and trained to carry out the assembly of electrical
components in a potentially explosive area.
The pertinent regulations for setting up and operation must be
observed when setting up or operating explosion protected
electrical installations. These include Directive 2014/34/EU,
BetrSichV (the German Ordinance on Industrial Health and
Safety), EN/IEC 60079-14, the DIN VDE 0100 series or other
nationally applicable standards or regulations.
DANGER
Incorrect use, faulty installation and operation jeopardise the
explosion protection and can lead to serious injuries and
damage to property.
The following special conditions must be heeded!
(1) The enclosure has been sealed in the factory and may
not be opened.
(2) Before installation, check whether the components are in
a clean and perfect condition.
(3) Keep the maximum surroundings temperature and aerial
dampness.
(4) Ensure the unit is dead (be aware of consumers with
stored energy)
(5) Cover any live neighbouring components.
(6) Press the module on the hat rail until it engages.
(7) All screws and terminals must be tightened using a
torque wrench, taking account of the recommended
connection torque for screws and terminals of 0. 4 Nm to
0.7 Nm. Suitable measures must be taken to ensure this.
Max-Eyth-Straße 16
DE
97980 Bad Mergentheim
GmbH
Deutschland
MODEX
Regulating and control components
PROFIBUS-Interface 4 x RTD in Ex
Tel.: +49 7931 597-0
info@bartec.de
Fax: +49 7931 597-119
www.bartec.de
i
7. Commissioning

Check before commissioning:

(1) Has the module been installed correctly?
(2) Is the enclosure undamaged?
(3) Has the connection been carried out correctly?
(4) Have you checked that the wiring is correct?
Once the final check has been conducted, the device can be put into
operation.
8. Operation
DANGER
There is danger to life if the device is not used correctly!
Comply with the special explosion protection conditions.
Only operate within the approved temperature range.
In failure the device must be closed down.
Addressing
The PROFIBUS-DP address can be set in the range from
01 to 99 using the rotary switches x1 and x10.
An address change will be applied when the power is back
on.
LED displays
Colour/
LED
Messages
status
ON
green
Voltage (L+/L-) exists
off
PROFIBUS-DP communication active
BF
red
Bus error – error on PROFIBUS-DP
Status error - short circuit or interruption
SF
red
Collective announcement for all entrances
and exits
yellow
Inputs or outputs active
1-4
red
Short circuit or interruption
Vorbehalt
Technische Änderungen behalten wir uns vor.
Änderungen, Irrtümer und Druckfehler begründen
keinen Anspruch auf Schadensersatz.
Typ 07-7331-2307/0000
5/18

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis