W-INVERTER SETUP:
|
|
System Type:
---
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GE Power:
1.4 kW
|
|
|
|
|
MeterPort:
---
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AC Charger:
OFF
|
|
WRM Feed-In:
OFF
|
|
|
Web SetPoint:
OFF
|
|
|
|
TA Position:
Pre PV
|
|
|
|
|
|
Max Pw Grid:
---
|
|
˅
˅
User manual
Value:
Settable values and description:
Sets the functionality of the AC system:
1-4K-LI: Requires the presence of the WRMxx, recharging from
AC-IN and feeding into the grid are not allowed.
2-PRO-LI: Requires the presence of the PV-OnGrid, feeding into
the grid are not allowed.
3-GE-LI: For use with a Genset. The meter port is used for
starting the Genset. Feeding into the grid are not
allowed. Charging power defined by the GE Power field.
4-FIAMM-R: Requires the presence of the PV-OnGrid,feeding into
the grid are allowed.
5-FIAMM-N: Requires the presence of the PV-OnGrid, feeding into
the grid are allowed.
6-PRO-LI_WEB: Requires the presence of the PV-OnGrid, feeding
into the grid are not allowed. It allows the remote
setting of the power to be exchanged with the grid.
7-CUSTOM: The operating characteristics of the system are
defined by the following fields.
<---..25,5 kW>: If the Max Pw Grid item is set or the MeterPort
item is set to the 'Genset' value, it defines the power
with which to charge the battery bank.
Defines the use of the MeterPort port on the W-INVERTER:
---: Port not used
PV Pulse: Input Port, to connect the pulse meter of on-grid
PV production.
Genset: Output Port, it is activated when the battery
percentage falls below the OFF disk # 1 threshold. And
it will remain active until the threshold is reached
ON disk # 1. (by connecting this port with the AUX1
input using the supplied cable, it is possible to
control the ignition of a generator)
Surplus: Output Port, activates when the battery exceeds the
OFF charge # 2 threshold. The signal will remain active
until the ON charge # 2 threshold is reached. (by
connecting this port with the AUX1 input using the
supplied cable, it is possible to control the switching
on of a load)
Allows the battery to be recharged from the mains.
Enables the WRMxx PV energy feed-in to the grid, when state of
charge is greater than OFF charge #2 threshold.
Enables the setting that allows you to remotely set the
power to be exchanged with the grid.
Pre PV; Post PV: If the external TA sensor is present, it
defines whether this is positioned before or after the
entry point of the existing on-grid PV system.
<---..25,5 kW >: Below the OFF threshold disch #1 defines the
maximum withdrawal that can be made from the grid. Above
that value, the inverter intervenes. If the battery
percentage falls below the OFF disch #1 - 3%, the
recharge from the mains takes place with the power
defined in GE Power.