Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40
2. Transportation and placement
2.3

Unpacking

To remove the packaging material, two people are required and they must comply with the following procedure:
- bring the item to the installation site using a forklift and/or a truck pallet with suitable characteristics (fig. 1);
- remove the plastic film and cardboards;
- bring down the wooden chute attached to the pallet and loose the screws of the brackets that fix the equipment on the
pallet (fig. 2);
- gently slide by hand the equipment along the chute using the wheels (fig.3);
- loose the four screws and remove the bracket on the right side of the equipment that fixed it to the pallet (fig.4).
(fig. 1)
18

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3 111 11

Inhaltsverzeichnis