Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
5. DooR
attention: Do not stand the assembled
door on the door gliders (1014) to avoid
damaging them."
Push the door gliders (1014) onto both ends of
door bar (1360) (5.1).
Assemble the door as shown in diagram 5.
Connect door rollers (1015) to the door bar
(1362) using bolt (1304), washer (1009) and
nut (1007) (5.4). Bolt door bar (1362) to upper
bar (1359) (5.3) and slide the door seal (1021)
into both side bars (1358) (5.6).
The door rollers can now slide into door runner
bar (1347) (5.7). Please ensure that the door
gliders are also running on the bottom track
(5.5). Once the door is correctly in place,
connect a nut and bolt into the end of door
runner bar (1347) as door stopper.
Adjust the door so that it moves freely.
6. RooF VeNtS
Connect the side bars (1065) and the top bar
(1386), using bolts (2004) (6.1).
Place the bolts (2004) to connect the bottom
bar (1387) in the prepared holes, and then
slide pane K into the tracks in side bars (1065)
(6.2).
Now connect bottom bar (1387), and ensure
that the window is totally square before
tightening all bolts.
Position the window in the ridge bar from one
end (6.3) and (6.4) and slide it to the required
position (6.5).
Connect the window sill (6.6) (1152) with the
extra bolts in the roof glazing bars (1395)
(6.6).
Bolt the window opener (1067) to the bottom
bar (1387) (6.6) using screws (1006) (6.7).
Place the plastic cap (1019) over the end of
the window opener (6.5) and connect both
window fixers (1016) onto the window sill
(1152) using screws (1006) (6.7).
7a. GlazING – PolycaRBoNate PaNeS
Please note the already mentioned safety
precautions.
Important! The UV-resistant side is indicated
by the plastic film and printing at the edge.
This side must face outside. Remove the film.
Note! Completely remove the film only after
the pane has been positioned in the
greenhouse. (The panes are cut marginally
shorter to allow for expansion in warm
conditions).
Press the PVC tubes (1379) into both ends of
the polycarbonate guides in aluminium profiles
(1390), (1391), (1392), (1393) and (1394)
adjacent to the corner bars (7.3).
994.01.2009
Remove one of the back middle bars (1391) or
(1392). Remove on both sides one middle bar
(1390) from the center of the side and one
middle bar (1395) from the centre of the roof.
Position holders (1311) (7.1) and (1312) (7.2)
in the middle of panes A.
Fit all polycarbonate panes into the guides in
the middle bars (7.4). Reassemble middle bar
(1391/1392) fitting it onto the pane (7.4).
Reassemble middle bars (1390) and (1395)
fitting them onto the panes (7.4).
Fix the panes to the corner profiles using the
glazing spring clips (1011) (7.7).
Connect panes G and D to the eave in the
middle of each pane, with screw (1003) and
washer (1305) (7.5). To achieve this it is
necessary to drill a 2mm hole through the
pane and the aluminium profile. The drill is not
included.
Assemble panes D and E onto the door using
holders (1313) (7.6) and glazing spring clips
(1011) (7.7).
FINIShING
If desired, it is possible to seal the greenhouse
at the edges using neutral silicone. Silicone is
not in cluded.
Place the warning label inside the house.
A full range of greenhouse accessories, to help
you make the most of this product, is available
from your stockist. Please inform yourself as to
the possibilities.

SaFety NotIce

In the event of high wind conditions, close the
door and all vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
commeNtS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the
positioning of greenhouses.
Please stick the included greenhouse model
label onto the door bar (1362) after
successfully assembling this product. This
information is important in the event that
replacement parts are later required.
Please keep these Assembly Instructions in a
safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the
specifications without prior notice.
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5000

Inhaltsverzeichnis