Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Procedure - Hitachi PSC-A16RS Installations- Und Betriebshandbuch

Centralized on/off controller
Vorschau ausblenden Andere Handbücher für PSC-A16RS:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33

9. OPERATION PROCEDURE

9.1. INDIVIDUAL OPERATION/STOPPAGE
¡ Preparation 1
Supply power to the unit.
ATTENTTION:
A. Supply power to the unit more than 6 hours before unit operation for compressor protection.
B. Do not cut OFF power during the term of using air conditioner.
¡ Preparation 2
Supply power to the centralized ON/OFF controller after the preparation of the unit is completed.
¡ Operation
Depress the individual RUN/STOP switch of the room (group) No. to operate/stop.
The operation lamp corresponding to the depressed switch is turned ON, and the air
conditioner is started operation.
¡ Stoppage
Supply power to the centralized ON/OFF controller after the preparation of the unit is
completed.
9.2. SIMULTANEOUS OPERATION/STOPPAGE
¡ Operation
Depress the simultaneous RUN/STOP switch when 16 rooms (16 groups) is stopped.
The operation lamp of 16 rooms (16 groups) is turned ON, and all the air conditioner
of 16 rooms (16 groups) is started operation simultaneously.
¡ Stoppage
Depress the simultaneous RUN/STOP switch when one or more room (group) is in
operation.
The operation lamp of the room (group) in operation is turned OFF, and the air
conditioner of the room (group) in operation is stopped operation.
INSTALLATION AND OPERATION MANUAL
Operation Lamp ON
Individual RUN/STOP Switch
Operation Lamp OFF
Individual RUN/STOP Switch
Depressed Simultaneous RUN/STOP Switch
Operation Lamp
Operation Lamp
All Operation Lamps are turned ON
Depressed Simultaneous RUN/STOP Switch
Operation Lamp
Operation Lamp
All Operation Lamps are turned OFF
19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis