Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Work; Cleaning And Care - Steelcase Lares Kurzanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 6
Moving slding top
Release the locks under both sides.
Pull out the sliding top until it stops.
5.3 Adjusting castors
Lares Mobile is supplied with castors under the table legs.

6. Maintenance work

Only use suitable tools for all activities and be sure to contact our customer service
department to clarify how to proceed.
6.1 Functional check
The components of the Lares products must be checked for correct functioning at regular intervals.
Interval
Inspection point
During assembly
Frame parts
Regularly
Melamin top
Frame screws
Top screws

7. Cleaning and care

Only use polishing and cleaning agents that are suitable for the respective materials (wood, plastics, metals, etc.).
Clean the desk surface regularly and if visibly soiled.
Use cleaning agents that are suitable for the respective materials to regularly clean hidden and visible
components.
8. Service and contact details
Manufacturer
Steelcase AG
Brienner Str. 42
80333 München
Germany
160066
Closing sliding top
Push back the sliding top.
Fix the locks under both sides.
Fixing castors
Press down the lock.
Functional check
Postions of the glides
Check general state
Check tightness
Check tightness
LineOne EMEA
E-mail:
Releasing castors
Push up the lock.
Required conditions
Glides completely
inserted in the leg
No damage
Not loose
Not loose
Telephone: +49 (0) 8031 405 – 111
DE lineone-de@steelcase.com
EN lineone-en@steelcase.com
FR lineone-fr@steelcase.com
ES posventaspain@steelcase.com
Lares
Measure (if required)
Insert the glides into
the legs
replace
retight
retight
Rev. A

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lares deskLares benchLares seLares mobileLares meeting

Inhaltsverzeichnis