Herunterladen Inhalt Inhalt Diese Seite drucken

Gluing Instructions - Megasat Caravanman 65 Premium V2 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Mounting and installation
7. Slightly roughen the drawn surface
with sandpaper (120 grit) and clean
the surface again with the cleaner
and allow the cleaner to flash off for
approx. 10 minutes.
ATTENTION: Do not touch the
surfaces afterwards!
3.2 Gluing instruction
1. Prepare the adhesive for assembly.
2. Now apply the adhesive to the
marked area of the roof in serpentine
lines so that the adhesive can cure
evenly over the entire surface.
3. Now immediately (within 5 minutes
of applying the adhesive) place the
antenna on the marked field. Press
the foot lightly and evenly on and
fix the antenna so that it does not slip, e.g. with an adhesive tape. After pressing, there
must be at least 2 mm of adhesive between the antenna foot and the surface. The
adhesive is cured after max. 48 hours at +18° C and a relative humidity of 50%. If the
air humidity is lower during installation, spray some water into the air again and again
after sticking the adhesive in the vicinity of the antenna.
4. Remove the possibly leaked adhesive immediately with a spatula or similar and clean
the contaminated surfaces with the cleaner and a fleece cloth.
5. For safety reasons, you can also attach the antenna base. Drill through the existing ho-
les in the antenna foot into the roof of your vehicle and fix it with a screw and lock nut.
To prevent the freshly glued base from slipping, wait with this work until the adhesive
has hardened.
6. After the complete assembly and hardening of the adhesive, a silicone joint can be
drawn around the antenna base.
ENGLISH
07

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis