Herunterladen Inhalt Inhalt Diese Seite drucken

Klarstein ENERGIEWENDE Bedienungsanleitung Seite 50

Pellet-heizung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
Floor protection plate
50
Mounting the exhaust pipe
The exhaust pipe outlet hole may be aligned horizontally to the heater
smoke outlet opening. In this case, the 1.5 m long flue pipe is laid outdoors.
You can also lay the 1.5 m long flue pipe on the inside (upwards to the
ceiling), in which case the outlet hole must be above the smoke outlet
opening of the heater.
After inserting the flue pipe into the wall, the gap should be filled
and sealed with heat-resistant mineral fibre. Seal the hole with high
temperature resistant cement.
Do not proceed with the installation until the cement has solidified.
Below is a standard installation drawing for reference. In this case, the
1.5 m long pipe is laid in the interior:
Termination cap
Wall thimble
Support bracket
Chimney pipe
Clean out
cover
Combustion air connection
(Minimum diameter 50  mm)

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1003415310034181

Inhaltsverzeichnis