5.4 Electrical connection

HAZARDOUS VOLTAGE!
Unqualified persons working on the compact
booster unit
Danger to life from electric shock!
Work on electrical equipment may only be performed
by specialist electric technicians.
Observe IEC 60364 regulations.
HAZARDOUS VOLTAGE!
Faulty mains connection
Damage to the electricity network, short circuit!
Observe the conditions for technical connections of
the local power supply companies.
The diameter of the electrical supply line has to be
determined according to the total connection value.
6
Commissioning/
Decommissioning
6.1 Commissioning
6.1.1 Start-up requirements
CAUTION!
Dry running pump
Damage of the pump / Compact booster unit
If the dry running protection is deactivated, then the
operator takes responsibility in the case of dry
running.
Before start-up of the compact booster unit, the following
points have to be ensured:
The compact booster unit is electrically connected to
all protective devices in accordance with the
regulations.
The relevant VDE and country-specific regulations
have to be adhered to and fulfilled.
6.1.2 Fill up and vent the compact buster
unit
CAUTION!
The pipeline is not free of residue
Damage of the pump / Compact booster unit
Before start-up (and testing) make sure that pipelines
and compact booster unit are free of residues.
The compact booster unit is hydraulically tested with
water and then emptied before delivery. The
whereabouts of residual water is technically
unavoidable.
Remove the caps of the connection openings shortly
before installation
Before start-up of the compact booster unit, observe
EN 806.
After long service life, a rinse or professional
disinfection is recommended.
MU1H-1382 GE23 R0521
GB
For larger or widely branched piping systems, the
rinsing of the compact booster unit can be done
locally.
Floating ring seals may briefly show signs of leakage
during start-up, but no longer after a short period of
operation.
Pipe fittings between pump and pipeline have to be
tightened.
The original operating manual of the pump is
available.
Flange connections have to be checked if they are
fastened tightly.
In and output openings for air-cooling of the motor are
free.
All shut-off valves in the system are open.
The precharge pressure of the membrane pressure
vessel is checked.
1.
Open the vent screws on the pump according to the
original operating instructions of the pump set.
2.
Slowly open the shut-off valves on the input side and
fill the system until pump medium runs out of every
ventilation borehole.
3.
Close the ventilation screws, tighten pump ventilation
lightly.
4.
Switching on the compact booster unit.
5.
Loosen the vent screws and allow any remaining air to
escape.
6.
Open shut-off valve.
7.
Loosen the vent screws and allow any remaining air to
escape.
8.
Tighten the vent screw.
9.
Check if the pump runs smoothly.
10.
Close the pressure-side shut-off valve and check
whether the pump reaches the zero point.
11.
Close shut-off valve
Pump switches off
6.1.3 Switch on
Version without speed control:
The compact booster unit is filled and ventilated
1.
Insert mains plug in the electrical socket.
Version with speed control:
The compact booster unit is filled and ventilated
1.
Insert mains plug in the electrical socket.
• When the power supply is active, the red standby
LED of the frequency inverter lights up
• When the system is ready for operation, the green
SET LED of the frequency inverter flashes
2.
Press the Start/Stop button of the frequency inverter
• Pump unit starts, the frequency of the flashing
operation LED increases
• When the operating LED is lit continuously, the
setpoint is reached
9

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Braukmann cbu142fu

Inhaltsverzeichnis