Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Customer Service/Support - ABNOX AXDV-R1 Montageanleitung

Rotationsdosierventil
Vorschau ausblenden Andere Handbücher für AXDV-R1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Valve is
properly
connected and
controlled, but
rotor does not
turn.

Maintenance

The specified maintenance intervals are for single shift operation. Maintenance has
to be carried out more often depending on the field of application, medium and in
case of operation in more than one shift.
When
What
Check the Rotary
Daily
Dosing Unit for leaks
Check all threaded
Weekly
connections and
fittings for leaks
Check seals for
Weekly
damage and wear
Remove general dirt
Weekly
deposits from the
device
Complete
Annually
maintenance
CAUTION
The product always has to be shut off prior to all work. The pneumatic and
hydraulic systems have to be de-pressurised. The pressure gauges have
to show 0 bar.

Customer service/support

ABNOX AG
Langackerstrasse 25
CH-6330 Cham
Switzerland
Phone
+41 (0) 41 780 44 55
Fax
+41 (0) 41 780 44 50
E-mail
info@abnox.com
Internet
www.abnox.com
The NBR stator is not compatible
with the dosing medium, causing
it to swell. This jams the rotor,
and the programmed flow monitor
shuts the valve off.
How
Visual
Visual
Visual
"lint-free", dry cloth
Replace brittle hoses
and leaking seals
Check stator and replace if
needed (see "Replacing the
stator")
Who
Operating company
technicians
Operating company
technicians
Operating company
technicians
Operating company
technicians
Operating company
technicians
EN
45

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Axdv-r1-oAxdv-r1-f

Inhaltsverzeichnis