Herunterladen Inhalt Inhalt Diese Seite drucken

Activating The Control Unit; Removing The Mattress System - Invacare SoftCloud Ace Gebrauchsanweisung

Wechseldrucksysteme
Vorschau ausblenden Andere Handbücher für SoftCloud Ace:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
IMPORTANT!
– Ensure that the foot bed end is robust enough
to support the control unit safely.
– Ensure there are no sharp objects which may
come into contact with the mattress system.
– Check that the attachment of the mattress does
not interfere with the movement or operation
of the bed.
– Do not secure straps to bed side rails as straps
will tear.
– Ensure that the positioning of the system does
not interfere with the ability to disconnect the
electrical power.
– Prior to activation ensure the CPR valve located
near the head end of the mattress is fully
engaged and that the mattress connector is
firmly connected to the control unit.
1. Remove all covers, sheets and mattress from the bed.
2. Place the mattress directly on the frame of the bed.
3. Position the mattress top cover facing upwards and air
hoses at foot of bed for control unit positioning.
4. On a standard bed, attach to the bed by securing the
two adjustable straps under each end of the bed. Ensure
buckles are securely fastened and straps are pulled tight.
Or
On a profiling bed, secure the two adjustable straps
around the moveable sections of the bed.

4.3 Activating the control unit

1. Position the control unit by hanging the hooks over the
foot board of the bed or side rails, ensuring that they
are robust enough to hold the control unit.
CAUTION!
– Ensure the air hose does not kink between the
bed frame and control unit.
2. Connect the mattress connector to the control unit.
IMPORTANT!
– Ensure that the power cord is in good condition.
3. Insert the power cord into the control unit then plug
into a grounded 220V 50Hz electrical outlet.
1630732-C
4. Press the power button for approximately three seconds
to activate the control unit.
The pressure LEDs will flash indicating the system
has activated.
IMPORTANT!
– Prior to pump activation ensure the CPR valve
located near the head end of the mattress is
fully engaged.
– Ensure that the mattress connector is firmly
connected to the control unit.
5. Allow approximately 30 minutes for the mattress to fully
inflate. Once ready, you should see the fourth pressure
LED plus alternating mode LED illuminate to indicate
that the system is ready for use (system automatically
defaults to Alternating Mode after start-up). For further
details see 5.3 Using the mattress system, page 11.
6. Once the Mattress is fully inflated the bedding can be
placed. Fit sheets loosely enough to allow for free
movement of the mattress air cells.
7. Ensure each sheet corner is placed through retaining
buckle.

4.4 Removing the mattress system

C
1. Switch off the control unit and disconnect from mains
supply A.
2. Remove the mattress connector B from the control unit
and disconnect the CPR tag C.
3. Place control unit and power cord on top of the mattress
and detach mattress from the bed frame.
4. Once air has been released from all cells, roll up the
mattress and return all items to the carry bag for safe
keeping.
IMPORTANT!
– Always follow the correct procedure when
switching off the control unit. When the unit
is switched off, it will issue a power loss alert.
This alert can be canceled by pressing the
power button for a minimum of two seconds.
IMPORTANT!
– Prior to restarting the system, ensure the
CPR tag is replaced and all sealing connectors
are firmly attached; and that the mattress
connector is replaced and firmly connected to
the control unit.
– Use target design to line up each plug with its
corresponding socket.
A
Setup
B
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Softcloud pro

Inhaltsverzeichnis