Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of The Mount On A Loadbearing Wall, Not Aerated Concrete (Plaster Thickness No More Than 40 Mm) - ONKRON NP25 Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 10
2.2 Installation of the mount on a loadbearing wall, not
aerated concrete (plaster thickness no more than 40 mm)
Put the drilling template (L) to the wall, mark drilling spots.
L
Drill holes using a Ø 10 mm (3/8") bit at
depth minimum 3.54" (90mm).
Put the mount to the wall the way,
that mounting slots are located at
the bottom.
Insert dowels (I) into the holes. Make sure that dowels are
completely in the wall. Tap them with a hammer.
Install the mount on the wall using screws М7х80 (Н).
IMPORTANT: Do not use the wrench (G) from the kit!
6
I
H
90 mm
(3.54")
The bottom
of the bracket
G

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis