Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Torqeedo 2218-00 Gebrauchsanweisung

Solar laderegler für power 48-5000
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
The battery cable must NOT be extended.
Connecting the battery
Switch off the system before installation (status LED on the battery housing and remote
throttle display are off).
Then screw the black M10 ring cable lug to the battery negative terminal and the red
M8 ring cable lug to the battery positive terminal.
Make sure that no electrical components are connected directly to the charge controller.
These should only be connected directly to the Power 48-5000.
RED = PLUS
In a system with two Power 48-5000 batteries, the charge controller should be connected
diagonally. In other words, connect the negative cable to one battery and the positive
cable to the other battery.
20
MODULE
BLACK = MINUS
YELLOW = PLUS
BLACK = MINUS
Connecting the TorqLink cabling
Connect the enclosed TorqLink T-cable to the solar charger as shown in
the following illustration and connect it to the TorqLink Backbone.
The charge controller must be connected to the TorqLink network for
proper functioning.
5 cm
90 cm
A maximum of 6 charge controllers may be operated in parallel.

5. Operation

The solar charge controller can switch the Power 48-5000 battery on and off automa-
tically when there is sufficient sunlight. As a result, the battery does not need to be
switched on or off manually. The controller has a multicoloured LED to indicate the
charging and error state.
Power 48-5000
DE
EN
FR
IT
ES
PT
DA
NL
SV
FI
21

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis