Herunterladen Inhalt Inhalt Diese Seite drucken

Adjustment Of The Sanding Belt; Belt Tracking Adjustment; Belt Tension Adjustment - Flott TBSM 100 Betriebsanleitung

Bandschleifmaschinen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ADJUSTMENT OF THE SANDING BELT

Belt Tracking Adjustment

Plug into an
1.
electrical inlet on
machine body before
connecting with the
power supply.
Turn tracking knob clockwise
2.
to make sanding belt towards
left side or turn counter-clockwise to make belt towards right side. Note: It is only allowed a tiny adjustment at
each turn.
Rotate belt by hand, meanwhile adjust tracking knob.
3.
Control the switch for a short on/off starting with left hand, meanwhile put right hand on tracking knob for
4.
clockwise or counter turning till the belt runs stably between the two rollers.

Belt Tension Adjustment

Be sure the switch is on OFF position. Measure the belt tension
from the bottom by thumb press. The tension was always well
adjusted before delivery ex works. The adjustment is required
when belt was used for a period and get loosed or when
renewing the belt.
The Procedure for Belt Tension Adjustment.
Open the steel cover.
1.
Turn the belt tension lever clockwise about 120° to
2.
release the tension.
The hex. nut is designed to hold the adjusting rod in
3.
position against the vibration during operation. This nut
needs to be loosened before making adjustment and
tightened after adjustment.
If the belt tension is too low.
Turn adjusting rod (part No. 14) upward to gain
4.
tension. If the belt tension is too high. Turn adjusting rod
(parts No. 14) downward to release tension.
Tips for adjustment.
5.
Each turning of adjusting rod makes rubber roller
outward
(of inward) about 2.5mm. A' micro adjustment, 0.42mm
for each phase turning of adjusting rod, is
recommended.
Close the steel cover and push down the belt tension
6.
lever.
After this adjustment, try with Tracking Adjustment.
7.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis