Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation Before The First Use; Unpacking For Inspection; Check Battery Power Capacity And Charge - Sublue Whiteshark Tini Betriebsanleitung

Underwater scooter
Vorschau ausblenden Andere Handbücher für Whiteshark Tini:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38

Preparation before the First Use

1

Unpacking for Inspection

Check appearance
After unpacking the product, please check carefully whether the inorganic body shell is
broken, the protective cover is fallen, the propeller blade is damaged, the battery back
cover cannot be opened, the battery swells or has liquid leakage, the battery sealing pad
is damaged, and other conditions affect the use of the product.
Check function
(1) Check whether the power system can be started and networked normally*, start the
thruster after networking, and check whether the propeller is running normally;
(2) Check whether the control handle can be started and networked normally*, press the
start button after networking, check whether the start button is stuck, whether it can
normally control the starting and shutdown of the power system's propeller, and check
whether the speed levels can be switched normally.
*For the operation method, please refer to the relevant content in the following instructions.
If you find any of the problems when unpacking, don't use it, and please contact
Sublue After-sale Service Center or its authorized service center. Do not run the
product for more than 30 seconds without water.
2
Check battery power and charge it
Charging the Battery of Power System
Connect the charger to the AC mains supply (100-240VAC, 50/60Hz).
Charging
Charging completed
6

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis