Zenner IoT Gateway Montage- Und Bedienungsanleitung Seite 9

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

You can additionally fasten the antenna cables to the
mounting bracket with cable ties.
The antennas are mounted identically for all variants us-
ing the supplied lock rings and serrated lock washers.
All antennas are connected to the gateway with the
enclosed N-connection cables.
5.3. Equipotential bonding cable
The potential equalization cable (ground cable, 16 mm²)
must be connected to the mounting support and a
bonding rail.
ill. 7
240
Note: Attaching the Equipotential bonding cable to a
lightning rod is not permitted.
115
115
197
ill. 8
ill. 9
6. Commissioning
The gateway starts immediately after plugging in/con-
necting the PoE Injector (making the electrical
connection).
If you want to check the boot process by means of the
LEDs, you can unscrew the cover of the housing. The
four LEDs can be seen at the lower end of the pcb and
10
will be named LED 1 to 4 from left to right in the follow-
ing.
The gateway passes through several phases during the
boot process, which are indicated by the LEDs. Please
observe the following sequence of the four LEDs. LED
No. 4 signalises the connection to the backend.
Phase
8
Boot process
Ready for opera-
tion with mobile
communication
connection
Ready for opera-
tion - network con-
nection
Ready for opera-
tion - network con-
nection + mobile
communication
fallback
Update by means
of mobile com-
munication
Update via
network
Change of provider C.
Explanation of the stages:
1. No power supply
2. Hardware initialisation
3. Hardware initialisation
4. Cellular network connection not active, no connection to
LoRa network server (LNS)
5. Cellular network connection active, no connection to LNS
6. Normal operation (6.1, 6.2, 6.3)
A. The power LED (1) flashes to signalise the update process
B. The power LED (1) flashes to signalise the update process
C. The modem tries to dial into another cellular network
Stage 1
2
1.
Off
Off
2.
Red
Red
3.
Green
Off
4.
Green
Off
5.
Green
Off
6.1
Green
Off
Green /
6.2
Green
Orange
Green /
6.3
Green
Orange
Flashes
A.
red /
Off
green
Flashes
Green /
B.
red /
Orange
green
Flashes
red /
Off
green
3
4
Off
Off
Off
Off
Red
Red
Red
Red
Off
Red
Off
Green
Red
Green
Off
Green
Off
Green
Red
Green
Red
Red
9