Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

INSTALLATION

If you want to use the hood in suction version with the air outlet at the back of the hood, make
sure to follow the indications given below in the drawing for a correct boring operation of the air
outlet opening.
When installing the hood in recycling version it has to be taken into consideration that space re-
maining between the hood and the upper limit (ceiling or self) is at least 8-10 cm.
On the wall, trace:
• a vertical line up to the ceiling or top limit, at the centre of the area where you intend to fit
the hood;
• a horizontal line at: 550 mm min. above the cooking hob;
• As shown, mark a reference point at 808 mm above the horizontal reference line, and at X
mm (X= see table in figure) to the right of the vertical reference line.
• Repeat this operation on the opposite side, checking levelling.
• Drill the points marked using a ø 12 mm bit
• Insert plugs with screws and brackets 11a in the holes then tighten them.
EN
Downloaded from
www.Manualslib.com
11a
manuals search engine
Boring the wall
Hood type
90
X
380
X
X
250
Rear air outlet
zone
9 9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis