Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Electrical Connection - Ascaso BABY T Serie Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 – Installation
The machine should be installed on a surface at least 1.2 m high. The surface on which
the machine is placed should be level, dry and stable. Machines come with height-
adjustable feet.
This appliance is not suitable to be installed in an area where a water jet could be used,
nor to be installed outdoors. This device is only suitable for installation in places where
its use and maintenance is restricted to qualified personnel.
To ensure correct use, the machine must be installed in places where the ambient
temperature is between + 5ºC / + 32ºC and the humidity does not exceed 70%.
It is advisable to leave a space around the machine in order to speed up maintenance
work, as well as the space for the coffee grinder.
In order to avoid the freezing of water in the machine, avoid installing it in places with
an ambient temperature equal to or lower than 0ºC. In case of freezing do not use the
machine and contact the manufacturer.
The appliance must be powered exclusively with potable and cold water in accordance
with current legislation. The pressure of the water network must be between 0.1 and
0.6 MPa. If this requirement is not met, consult the manufacturer. Between the water
network and the feeding tube of the machine, a stopcock must be installed in order to
interrupt the supply when necessary.
The water and steam expelled by the machine's tubes are extremely hot and can cause
serious injury.
Any failure to comply with the instructions and warnings given by the manufacture may
invalidate the machine's warranty.
6 – Electrical connection
The machine is supplied ready for connection according to the required specifications.
Before connecting the machine, make sure that the data on the rating plate correspond
to those of the electrical distribution network.
10
MANUAL BABY T ENG-ESP_DE 2020 .indd 10
MANUAL BABY T ENG-ESP_DE 2020 .indd 10
22/09/2020 16:29:10
22/09/2020 16:29:10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Baby t zeroBaby t plus

Inhaltsverzeichnis