Herunterladen Inhalt Inhalt Diese Seite drucken

Kaco blueplanet 87.0 TL3 Installationsanweisung Seite 4

Vorschau ausblenden Andere Handbücher für blueplanet 87.0 TL3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
4. The damage report must be received by the shipping company in writing within
six days following receipt of the component. We will be glad to help you if ne-
cessary.
Install DC overvoltage protection
↻ NOTE: Lack of voltage and current ensured on the PV inverter.
1 Unfasten the housing cover of the PV inverter using the 6 screws and remove
carefully [
T_25]
2 Open the packaging of the DC SPD kits and remove components.
NOTE: Do not change the coding of the overvoltage protection modules. 3
MOV type modules are to be inserted.
3 Open the locking latch on DC base.
4 Insert the DC overvoltage protection modules into the DC base one after an-
other.
5 Lock the modules with the locking latch.
6 Remove SPD monitoring jumper for automatic monitoring.
7 Lift the housing cover onto the housing and loosely tighten the fastening
screws.
8 Tighten the housing cover using all 6 screws in diagonal pairs [
4.8 Nm]
» DC overvoltage protection is integrated with the PV inverter.
Page 4
DC overvoltage protection on blueplanet 87.0-150TL3
T_25 /

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Blueplanet 150 tl3

Inhaltsverzeichnis