given appropriate supervision or instruction concerning use
of the appliance by a person responsible for their safety.
when its operation has been clearly explained to them and
they are able to use it safely while recognising the dangers
of misuse.
turning off the double-pole switch installed on upstream the
appliance.
All measurements are in mm.
PRE-INSTALLATION REQUIREMENTS
IMPORTANT: Given the high capacity and weight of the
and building services engineering study is necessary.
TROUBLESHOOTING
In the event of abnormalities run the following checklist.
All hydraulic connection checkup must be performed by a
hydraulic installation technician.
If the water is slow to drain away, check that the drain is not
blocked.
If the above operations do not solve the problem, contact your
nearest service centre or the company.
9
EN