Herunterladen Inhalt Inhalt Diese Seite drucken

Routine And Special Maintenance; Pre-Installation Requirements; Technical Information - glass 1989 PANNELLI VASCA MAWI Installations- & Wartungsanleitung

Bathtub panels
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

EN
However the instructions remain unchanged.
unconsciousness.
of misuse.
All measurements are in mm.

PRE-INSTALLATION REQUIREMENTS

IMPORTANT: Given the high capacity and weight of the
product (see product speci cations), a speci c structural
and building services engineering study is necessary.
the mixer.

TECHNICAL INFORMATION:

manual version.
When making the connection to the electrical mains, a double-
the relevant standards.
GROUNDWIRE.
EQUIPOTENTIAL CONNECTION.
The
following
manufacturer) are re uired for installation:
kit and no other types of piping must be used.
column of the bath (connection to waste column with 1 ½"
After cleaning, rinse thoroughly with plenty of water to
remove all traces of detergent and dry with a soft cloth.
A
:
VOID
detergents, alcohol, acids for domestic use, acetone or other
solvents which damage the surface.
IMPORTANT:
cause damage.
Rinse thoroughly with plenty of water to remove all traces
of detergent.
PANELS
Use soft cloths and non-abrasive
After cleaning rinse thoroughly with clean water to remove
any cleaner residue.
max 60°C
detergents, alcohol, acids for domestic use, acetone or other
solvents, which damage surfaces.
C.V. (see Pre-
– essential oils or bath salts.
Special maintenance must be carried out by
personnel.
10
accessories
(not
supplied
pipes provided in the
ROUTINE AND
SPECIAL MAINTENANCE
A
:
VOID
by
the
uali ed

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis