Herunterladen Inhalt Inhalt Diese Seite drucken

Putting The Device Into Operation - novaer INUK 2.6 C01 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CHECK BEFORE PUTTING INTO OPERATION
The following distances must be observed to guarantee the functi onality of the mobile air conditi oner.

PUTTING THE DEVICE INTO OPERATION

Open the packaging and remove the box from the top. Pack the device and all delivered parts (see drawing below).
LCD remote control
Round window connecti on
(1), which is positi oned
between the hose end pie-
ce and the end connecti on
for the window.
Flat connecti on that is
fi xed between the exhaust
opening and the hose.
Clip
Hose connecti on for
condensate drain
3-piece window adapter
set (A + B + C)
Round connecti on for
window adapter set, which
is positi oned between the
hose end piece and the
window adapter (A)
window adapter (A)
Remote control batt eries
(Typ AAA)
End connecti on for the
window (2), delivered in
2 parts
Tube
Power cord holder
Screws
Window adapter for
window installati on (B)
Cover (C)
EN
25

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis