additional safety instructions must be observed in
EN
ATEX zones 1, 2, 21 and 22:
• BGR 132 (ZH 1/200), DIN 292-1, DIN 292-2
• DIN EN 1127-1
• EN ISO 80079-36
• EN ISO 80079-37
• ATEX Directive 2014/34/EU Annexe II
• Machinery Directive 2006/42/EC
Earthing measures must be taken at the place of in-
stallation and must be verified before any commis-
sioning and at regular intervals.
WARNING! Risk of personal injury
The product must not be used in ATEX zones 0,
20. In addition, it must not be used in areas in
which there is an identified risk of electromag-
netic waves, ionizing radiation or ultrasound
(see EN 1127-1, sections 5.3.9 to 5.3.12).
WARNING! Risk of personal injury
This device may only be operated with the in-
dividually identified media (air or water). Only
verified and approved hoses must be used, see
Chapter 8 Earth control measurement after
installation/service
and changing the hose or
6 Explanation of DIN EN 1127-1 zones
1 and 2
6.1 Zone 1
A place in which an explosive atmosphere consisting
of a mixture with air of flammable substances in the
form of gas, vapour or mist is likely to occur in normal
operation occasionally.
6.2 Zone 2
A place in which an explosive atmosphere consisting
of a mixture with air of flammable substances in the
form of gas, vapour or mist is not likely to occur in nor-
mal operation but, if it does occur, will persist for a
short period only.
7 Commissioning
Before every use, the hose reel must always be
checked for visible damage to the hose reel and ac-
cessories, in particular, the hose equipment and hose
connections.
Dust deposits and caked layers must be removed,
especially from the rotating parts such as the inside
and outside of the drum, taking care not to stir up the
dust. Test the operation of the rotating parts, for ex-
ample, the swivel and the hose outlet.
Especially at temperatures below 0 °C, if water is used
as the medium, ensure that remains of the medium do
not freeze and cause the hose reel to stop function-
10
Series 889 Ex
and
Chapter 10 Mounting
swivel.
ing. The remains of the medium must be emptied from
the hose.
WARNING! Risk of personal injury
Defective parts must be replaced or necessary
repair work carried out in suitable specialist
workshops before every use. Only original re-
placement parts must be used.
WARNING! Risk of personal injury
Check the operation of the shutoff device on
the supply pipe system.
Check that the ATEX zone marking and the medium,
with pressure and temperature, are permitted for the
intended use (see type label).
See also the Instruction Manual.
Connecting to the pipework system: See Instruction
Manual.
Avoid contact with chemical products.
Where accessories are used, they must be installed
securely and without leaks.
The additional safety requirements must be observed
when accessories are used.
WARNING! Risk of personal injury
The carried medium must never be released
unless the end of the supply hose, with any ac-
cessories, is held firmly in the hands.
CAUTION! Risk of equipment damage
Hose whip if the end of the supply hose is
loose.
WARNING! Risk of personal injury
Only release the extended supply hose when
the ratchet mechanism is securely engaged at
the reel.
When retracting, hold the supply hose firmly in
the hands until the hose stop reaches the hose
outlet.
8 Earth control measurement after
installation/service
Check the earthing between the coupling of the sup-
ply hose (fully unrolled from the reel) and the earth
point of the hose reel. The ohmmeter must indicate
less than 100x106 ohm (R < 100M Ω). See Figure 1.
Check the earthing between the coupling of the sup-
ply hose (fully unrolled from the reel) and the earth
point of the hose reel. The ohmmeter must indicate
less than 50x106 ohm (R < 50M Ω). See Figure 2.
9 Decommissioning
• Shut off the supply of the carried medium at the
supply point.