Instruction manual Core cutter
Working with the core cutter
7
Working with the core cutter
7.1
Preparation
Ensure that the branch saddle has been successfully welded onto the pipe.
Ensure that the cooling time has been adhered to.
Check the machine for its functionality prior to the operation of the facility.
Thoroughly prepare the drill areas.
Install the core cutter on the machine.
Ensure that only drilling machines with safety clutches are used.
31