Herunterladen Diese Seite drucken

ABB SACE FORMULA A2 UL Installationsanleitung Seite 2

Werbung

E
1
2
3
3
G
35
1.38"
17.5
Y
0.69"
Ø4.5-M4/0.18"-M4
X
X
Y
A
B
C
WITHOUT
FLANGE
69
43
34
SENZA
1.34" 0.53"0.67"
2.72"
1.69"
MOSTRINA
H
135 lb·in
Fc CuAl 1 AWG...300 Kcmil
Cu
Al
OK
OK
225A
250A
OK
-
© Copyright 2011-2014 ABB. All rights reserved.
www.abb.com
35
1.38" 1.38"
99.8/3.93"
32/1.26"
X
D
E
13.5 17
135 lb·in 1AWG - 4/0AWG Cu cable
177 lb·in 250kcmil Cu cable
135 lb·in 2/0AWG - 300kcmil Al cable
Stranded
Cu
MIN
1 AWG
MAX
250 kcmil
Al
MIN
2/0 AWG
MAX
300 kcmil
F
105
60/2.36"
4.13"
38/1.5"
Y
35
2.6/0.1"
36.5
=
=
1.44"
X
X
52.5/2.07"
Y
Ø18
105
4.13"
Ø0.71"
39.5
1.56"
=3
=0.19"
135 lb·in
Flexible
Usare cavi isolat o eseguire prove
I
di tipo specifiche sull' installazione.
Use
insulated cabl
specific type test on the installation.
Isolierte
Kabel
verwenden oder die
spe
zifische Typprüfung auf derInstallation
durchführen.
Utiliser un câble isolé ou réaliser un test
de type spécifique sur installation.
Utilizar un cable aislad s o efectuar una
prueba de tipo específico sobre instalacíon.
73/2.87
FC CuAl 1 AWG ... 300 Kcmil
Ø17/Ø0.67"
X
FC CuAl 300 ... 350 Kcmil
A
=2
=0.08"
90
3.54"
177 lb·in (350 Kcmil)
Fc CuAl 350 Kcmil
Al only
e or perform
o
A2/III-Fc CuAl
Y
C
X
X
E
Y
Stranded
Flexible
350 kcmil
MAX

Werbung

loading

Diese Anleitung auch für:

Sace formula a2 iii ul