Herunterladen Inhalt Inhalt Diese Seite drucken

Upright AB-46 Bi-Energy Betriebsanleitung Seite 8

Vorschau ausblenden Andere Handbücher für AB-46 Bi-Energy:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BY CRANE
Stand clear of machine when lifting.
Check specifications on back page, insure that
crane and slings are of correct capacity to lift
weight of unit.
1. Insure that boom is fully lowered and retracted.
2. Attach straps to chassis lifting lugs only. Insure that
straps are adjusted properly to keep unit level when
lifting.
BY TRUCK OR TRAILER
1. Insure that boom is fully lowered and retracted.
2. Maneuver the machine onto bed of truck / trailer.
3. When winching, follow instructions for emergency
towing on page 7. Attach winch cable to front tie
down lugs.
Downloaded from
www.Manualslib.com
Transportation
Chassis Tie Down /
Lifting Lug (typ.)
Figure 6: Securing the Machine for Transportation
manuals search engine
Do not winch machine faster than 3 mph.
4. After winching, insure that brakes are set.
5. Secure the machine to the transport vehicle using
chains / straps of adequate load capacity (refer to
specifications, back page) attached to chassis tie
down lugs (see figure 6).
6. Place a wooden block (7.5" x 4" x 28") under
platform support braces as shown (see figure 6).
7. Attach ratchet strap; under platform floor grating,
over support braces (see figure 6). Tighten securely,
do not overtighten.
NEVER elevate the machine while on a truck or
trailer.
Wooden Block
7.5" x 4" x 28"
8

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis