Herunterladen Inhalt Inhalt Diese Seite drucken

Maico AE 10/1 Montage- Und Betriebsanleitung Seite 38

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

AE 10/1, AE 15/1
● Be sure to observe the relevant regulations
for electrical installation; in Germany this is
particularly VDE 0100, with the corre-
sponding parts.
● Guarantee the degree of protection by
undertaking installation correctly and cor-
rectly feeding the cables into the housing.
7.1 Preparations for installation
1. Switch off the mains power supply, po-
sition a visible warning sign to avoid the
unit being accidentally switched back on,
check that there is no voltage present.
2. The prescribed minimum distances be-
tween the wall and the ceiling shown in
the following figure must be observed.
DE
UK
VENTILATOREN
FR

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ae 15/1

Inhaltsverzeichnis