Herunterladen Diese Seite drucken

Conel CLEAR FILL Montageanleitung Seite 7

Flasche large
Vorschau ausblenden Andere Handbücher für CLEAR FILL:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.
4.
1
/
Close the upstream and downstream shut-off
valves of the heating circuit filling station.
/
Place the large O-Ring into the groove (d) of the
heating circuit filling station.
d
/
Slide the small O-ring onto the connecting sleeve
e
of the connection adapter (e).
/
Ensure proper fit of O-rings!
/
Screw the connection adapter with the braided
hoses (g) to the external thread (f) of the heating
circuit filling station.
f
2
g

Werbung

loading