BOILER CLEANING

The steam generator performs a regular internal boiler cleaning procedure that lasts about 4-10 minutes.
This procedure is only signalled when the Hammam/Turkish bath is operating, when the temperature setting
button flashes.
The picture below shows an example at medium temperature.
7.1

ROUTINE MAINTENANCE

Maintenance must only be performed by qualified personnel.
Before gaining access to any of the internal parts, disconnect from the electricity and water
mains.
In all circumstances, maintenance must be performed in compliance with the safety regulations
that apply to the installation site.
EFFEGIBI
steam generators have been designed to need little maintenance.
®
However, every six months, or more often in hard-water areas (over 30 French degrees), inspect
- the inlet and outlet valves;
- the boiler.
Remove any deposits such as lime scale and other impurities produced by boiling water.
44
The data and features referred to are not binding on EFFEGIBI and the company reserves the right to make any appropriate changes without having to give prior warning or replace this manual.
TOPKAPI OPERATING AND MAINTENANCE MANUAL
Boiler cleaning signal

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis