Herunterladen Inhalt Inhalt Diese Seite drucken

Exploded Diagram - Yamaha GP1300R Zusammenbauanleitung

Vorschau ausblenden Andere Handbücher für GP1300R:
Inhaltsverzeichnis

Werbung

EXPLODED DIAGRAM

Step
Procedure/Part name
5
Band
6
Band
7
Throttle cable
Q'ty
1
Fasten the QSTS cables and handlebar switch
lead with band at the handlebar.
1
1
Installation steps:
• Install the throttle cable end into the throt-
tle lever.
• Fit the seal into the groove in the bracket.
• Turn the adjuster 1 in/out until the speci-
fied free play is obtained.
Throttle lever free play e:
4–7 mm (0.16–0.28 in)
Turn in
Turn out
• Tighten the locknut 2.
– 5 –
Service points
Free play is increased.
Free play is decreased.
E

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis