Heat pump outdoor unit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 249
INSPECTION ITEM
Main power
source voltage
Operation circuit
voltage
Fan rotation
direction
Fan noise and
vibration
Fan operating
current
Inter air
temperature
Outlet air
temperature
Compressor
suction pressure
Compressor
dicharge pressure
Compressor
operating current
Compressor
frequency
Suction pipe
temperature
Discharge pipe
temperature
Crankcase heater
Airtight Test with
Nitrogen gas
Evacuation
Power source
voltage
Inlet air
temperature
Outlet air
temperature
Fan rotation
direction
Fan noise and
vibration
Fan operating
current
(Remarks)
INSPECTION
STANDARD
METHOD
±10% of rated
Tester
voltage
±10% of rated
Tester
voltage
Positive
Visual inspection
direction
Listen and touch
None
Clamp meter
Temp. difference
Thermometer
At cooling:
9-11°C
At heating:
Thermometer
2-3.5°C
Pressure gauge
Pressure gauge
Clamp meter
LED display
Thermometer
3-15°C
Thermometer
85-105°C
Touch by hand.
Should be heated.
Under 2.94 Mpa for 24 hours ro more
Under the pressure of 5 tor.
for 3 hours or more
±10% of rated
Tester
voltage
Temp. difference
Thermometer
At cooling:
9-13°C
At heating:
Thermometer
15-20°C
Visual inspection
Right direction
Listen and touch
Clamp meter
ACTUAL MEASUREMENT
Good
Good
kg/cm
INVERTER
kg/cm
INVERTER
INVERTER
INV
°C
No.
°C
No.
No. 1 Good Bad No. 1 Good Bad
YES
YES
Room A G/B Room B G/B Room C G/B Room D G/B
Room E G/B Room F G/B Room G G/B Room H G/B
Room I G/B Room J G/B Room K G/B Room L G/B
Room M G/B Room N G/B Room O G/B Room P G/B
Room A G/B Room B G/B Room C G/B Room D G/B
Room E G/B Room F G/B Room G G/B Room H G/B
Room I G/B Room J G/B Room K G/B Room L G/B
Room M G/B Room N G/B Room O G/B Room P G/B
Room A G/B Room B G/B Room C G/B Room D G/B
Room E G/B Room F G/B Room G G/B Room H G/B
Room I G/B Room J G/B Room K G/B Room L G/B
Room M G/B Room N G/B Room O G/B Room P G/B
Room A G/B Room B G/B Room C G/B Room D G/B
Room E G/B Room F G/B Room G G/B Room H G/B
Room I G/B Room J G/B Room K G/B Room L G/B
Room M G/B Room N G/B Room O G/B Room P G/B
Room A G/B Room B G/B Room C G/B Room D G/B
Room E G/B Room F G/B Room G G/B Room H G/B
Room I G/B Room J G/B Room K G/B Room L G/B
Room M G/B Room N G/B Room O G/B Room P G/B
Room A G/B Room B G/B Room C G/B Room D G/B
Room E G/B Room F G/B Room G G/B Room H G/B
Room I G/B Room J G/B Room K G/B Room L G/B
Room M G/B Room N G/B Room O G/B Room P G/B
System Check List
Judge-
ment
V
V
Bad
Bad
A
°C
°C
2
2
kg/cm
Standard
2
kg/cm
2
Standard
A
A
Standard
Hz
°C
No.
°C
No.
NO
NO
Installation Manual 61